GoTab Product Roadmap
"Keep selling at peak" + "Own venue-grade orchestration"
Outcomes-driven roadmap tied to competitive analysis findings and feature recommendations. Structured around measurable success criteria with clear dependencies.
Horizon: Feb 2026 - Jul 2026 (6 months)
Positioning Thesis
Turn reliability into a marketed product advantage
GoTab's key risk is trust/reliability perception (VoC references unexpected outages + tablet-terminal comm/payment issues). "Resilience Center" directly addresses this with multi-device degraded selling + recovery tooling.
Double down on venue-grade, mobile-first commerce
The competitive analysis flags GoTab's wedge as QR/online ordering + pre-auth tabs included and venue primitives like zones + dynamic routing. "Venue Orchestrator" productizes these into repeatable venue ops.
Pilot-to-scale with proof
In 6 months, produce measurable improvements in offline resilience, peak-hour throughput, routing accuracy, and pickup flow—the buyer priorities most likely to shift competitive win-rate vs Toast/Square/Lightspeed.
6-Month Timeline
De-risk Foundations
Validate UX + build foundations
- [RC] Validate degraded-mode UX (banner + checklist) with 6-8 operators; prototype Recovery Console
- [VO] Validate "Concepts + unified cart + pickup" flow (QR-first) with 2-3 venue design partners
- [FND] Define offline queue + idempotency model; audit log schema; RBAC gates; baseline event taxonomy
Deliverables
Resilience MVP → Pilot
Ship Resilience Center MVP; build Venue Alpha
- [RC] Build MVP: degraded detection + banner/checklist; local-first order queue + idempotent sync; Recovery Console v1; terminal comm triage wizard v1
- [VO] Build Alpha behind flags: Concept entity + menu mapping; order split + routing; Expo Board v1; QR unified cart prototype
- [GTM] Pilot training: "offline drill" + shift-lead runbook; support taxonomy + on-call plan
Deliverables
Pilot Expansion
Expand pilots + closed-loop learning
- [RC] Expand pilot to full 6-10 locations; improve fallback payment flows; implement heartbeat/status API; add basic duplicate detection flags
- [VO] Alpha → Pilot at 1 venue: Concepts + split routing + Expo Board + pickup codes + guest status page v1
- [FND] Add routing ACK/visibility; performance harness for QR + expo; parity checks for menu/channel differences
Deliverables
Beta Hardening
Trust + peak controls
- [RC] Beta features: conflict handling; Post-Incident Report export; multi-location Health Dashboard (P1); in-product status surfacing
- [VO] Beta to 2-3 venues: pickup flow improvements; manual + soft throttling; config validation tool v0
- [GTM] Packaging + enablement: "Keep Selling" narrative + sales battlecards; support macros; pilot weekend playbooks
Deliverables
Resilience GA
GA Resilience + scale venue mechanics
- [RC] GA: harden reliability surfaces; offline drills module; incident bundle export (CS); expand to 30-50 locations; publish internal SLOs + weekly reliability readout
- [VO] Beta expansion to 8-10 venues: automated throttling; allocation reporting export by concept; manager reroute action with audit log; config validation + test order tool v1
- [FND] Expo tablet performance optimizations; KDS/printer routing load tests
Deliverables
Venue Orchestrator GA
GA Venue + "Venue Ops" package
- [VO] GA: stabilize templates + guardrails; expand to 20+ venues; finalize "Venue Ops" package enablement; improve guest status/pickup UX
- [RC] Continue rollout + optimization; embed reliability proof (case studies, status posture)
- [GTM] Case studies + ROI calculator (labor minutes/order, throughput, error reduction) + competitive win-rate reporting
Deliverables
KPI Targets
Measurable outcomes tied to roadmap delivery.
| Metric | Baseline | Target |
|---|---|---|
| Incident Impact Minutes | 60/month | ≤20/month |
| Keep Selling Rate | 50% | ≥85% |
| Support Tickets (offline/outage) | 40/100 locations | ≤25/100 locations |
| Reconciliation Time | 45 min | ≤15 min |
| Routing Error Rate | 2.0% | ≤0.8% |
| Peak Throughput | 120 orders/hr | 135 orders/hr |
| Pickup Friction | 18% | ≤10% |
| Self-Serve Mix at Peak | 25% | ≥40% |
| QR Menu Load Time (p95) | TBD (baseline M1) | <1.5s |
| Kitchen Ticket Routing (p95) | TBD (baseline M1) | <500ms |
Key Tradeoffs
Explicit decisions made to optimize for the stated outcomes.
- 1
Offline scope intentionally narrow (orders + routing first) to reduce conflict/PCI risk and ship safely
- 2
Venue MVP is QR-first—kiosk support deferred until unified cart + split routing is stable
- 3
Single merchant-of-record in V1—allocation reporting rather than complex multi-merchant settlement/payout automation
- 4
Throttling starts explainable (manual + soft) before automation to build operator trust
- 5
Early investment in instrumentation + parity checks to produce credible metrics for competitive differentiation
Feature Bets in This Roadmap
This roadmap incorporates the following recommended features from competitive analysis.
Want the full artifact?
Email me to request a PDF of this complete 6-month roadmap with detailed milestones.
Explore Other Playbooks
See how I approach product strategy across different industries.